The Flowmax 2200 model completed the desludging of a municipal effluent pond in NZ in August 2011. Total Production was 1,000 MT of Dry Solids. The 2200 model produced an output of up to 22MT per hour at 22.5% Dry solids.

Very low usage of Flocculant was used.

See below video of the project

 

Comments are closed.